Front steps painted
Front steps painted
Front bench painted
Front bench painted
Railing painted
Railing painted
Front deck painted
Front deck painted
Benches painted
Benches painted
Dining bench painted
Dining bench painted
New railings
New railings
Camp History
Camp History
Tyler and Ed painting
Tyler and Ed painting
Tyler painting railing
Tyler painting railing
Ed and Tyler sanding
Ed and Tyler sanding
Ed installing panels
Ed installing panels
Michele painting the deck
Michele painting the deck
Deck and logo
Deck and logo
Deck painted
Deck painted
Ramp waiting for paint
Ramp waiting for paint
Family camp sign
Family camp sign
Steph in dining hall
Steph in dining hall
Tyler installing panels
Tyler installing panels
Tyler sanding the deck
Tyler sanding the deck
 
Powered by Phoca Gallery

DONATE to the Friends!

 

Newsletter

() Mandatory fields

Information

×

Upcoming Events

May 2024
S M T W T F S
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31